The main collimator at IAC

Finally, we got the main collimator. This master optical piece reached IAC on Friday August 12. Ana, with the help of Felix, made the  reception of the box and opened it. At first glance, the packing and additional protections look in perfect conditions.

The mirror will be checked on Tusday August 16, then it will be sent directly to Geneva with the frame and integration tools.

The integration will occur in Geneva where Samuel will be doing it during September.

This entry was posted in Project, Technics. Bookmark the permalink.

Comments are closed.