News from integration – weeks 37 to 39/2016

Attendees:
Paranal mission team
Marco Landoni
Samuel Santana
Ian Hughes
Igor Coretti

Hereafter are summarized some of the activities held during these three weeks 37 to 39:

In Paranal, the installation of the first Coudé Train is described in another post

In Geneva:

  • Marco Landoni made some tests and tuning on the Front-End rotating stage.
  • Samuel and Ian finalized the installation and metrology of the Main Collimator
  • Igor worked on the routing of the cables and their labelling
  • Geneva mechanics people worked on enhencements for the clean tent and the installation tools